[1]
Wardani, N.M.E., Musdalifah, S. and Lusiyanti, D. 2018. OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CITRALAND PALU MENGGUNAKAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) – CRITICAL PATH METHOD (CPM). JURNAL ILMIAH MATEMATIKA DAN TERAPAN. 15, 2 (Dec. 2018), 197-208. DOI:https://doi.org/10.22487/2540766X.2018.v15.i2.11353.