(1)
OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CITRALAND PALU MENGGUNAKAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) – CRITICAL PATH METHOD (CPM). JIMT 2018, 15 (2), 197-208. https://doi.org/10.22487/2540766X.2018.v15.i2.11353.