Wardani, N. M. E., Musdalifah, S., & Lusiyanti, D. (2018). OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CITRALAND PALU MENGGUNAKAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) – CRITICAL PATH METHOD (CPM). JURNAL ILMIAH MATEMATIKA DAN TERAPAN, 15(2), 197-208. https://doi.org/10.22487/2540766X.2018.v15.i2.11353