“OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CITRALAND PALU MENGGUNAKAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) – CRITICAL PATH METHOD (CPM)” (2018) JURNAL ILMIAH MATEMATIKA DAN TERAPAN, 15(2), pp. 197–208. doi:10.22487/2540766X.2018.v15.i2.11353.