[1]
“OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CITRALAND PALU MENGGUNAKAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) – CRITICAL PATH METHOD (CPM)”, JIMT, vol. 15, no. 2, pp. 197–208, Dec. 2018, doi: 10.22487/2540766X.2018.v15.i2.11353.